HPP Jiguey 98 MW - Dominican Republic

Client
Location
Dominican Republic
Time Frame
2011 – 2012
Services

- Detailed Engineering and Technical Specifications for the Rehabilitation of the Hydromechanical and Civil Works of the Hydroelectric Complex.
- Adaptations of the Output Channel of the Hydropower Plant.
- Supervision of the Rehabilitation of the Hydroelectric Power Plant.
Technical Details

- Installed capacity: 98 MW
- Plant type: Plant with seasonal reservoir
- Head: 270 m
- Turbine type: Francis
- Subterranean work – tunnel length: 6.92 km
- Powerhouse: Open air