HPP OCO 2010 Cascade 168 MW – Peru

HPP OCO 2010 Cascade 168 MW - Peru

Client

OHYSA – Ocoña Hydro S.A.

Location

Arequipa, Peru

Time Frame

2012 – 2013

Services

Feasibility Study and Tender Documents:

  • Design Criteria.
  • Hydrology and Sedimentation Studies.
  • Geology, Geotechnical and Topography Studies.
  • Electric Market Studies.
  • Optimization Study of the Hydroelectric Power Scheme applying the probabilistic Monte Carlo method.
  • Definitive Design of the Hydroelectric Powerplant.
  • Concept optimization applying the Monte Carlo method.
  • Mainstructures arrangements accordingto topographical and geological studies.
  • Energy calculation.
  • Cost estimates.
  • Design of the main structures at basic design level.
  • Financial Evaluation Studies based on the Monte Carlo method.
  • Seismic Risk Assessment Studies.

EPO Electrical Grid Connection Study and Permitting

 

Technical Details

  • Installed capacity: 168 MW
  • Plant type: Pure run-of-river type plant
  • Head: 230 m
  • Turbine type: Francis
  • Subterranean work – tunnel length: 19 km
  • Powerhouse: Open air